Skip to content

Construction of two concrete bridges over Bhamke and Baulah rivulets in Tulsipur

nabil bank

Dang. Two bridges have been constructed at a cost of Rs 42.52 7 million at Bhamke Khola of Tulsipur Sub-Metropolitan City-1 and Baulaha Rivulet of Shantinagar Rural Municipality-3.

According to Shantinagar rural municipality chair Pramod Basnet, both the bridges have come into operation after the construction company handed them over to the local government.

The municipality has been continuously monitoring the construction company to complete the construction work of the under-construction bridge over ThePetakura Rivulet flowing through Shantinagar Rural Municipality-3 as soon as possible.

Prabhu
sikhar insurance

प्रतिक्रिया दिनुहोस्

global ime