Skip to content

New bridge to be constructed over Kaligandaki river linking Parbat and Baglung

nabil bank

Mountain. A long and high suspension bridge is to be constructed over Kaligandaki river to connect Parbat and Baglung districts. The fifth bridge is going to be constructed linking Kushma Bazaar and Balewa of Baglung.

The construction of a 415-metre-long bridge has begun to connect Ananda Monastery at Kushma Bazaar-5 to Kukurgadhe of Narayansthan of Baglung Municipality-14.TAG_OPEN_div_26  Kushma-Kaiya suspension bridge, Kushma-Balewa mechanical bridge, Kushma-Balewa bungee jump bridge and Shirsuwa-Kaiya suspension bridge have already been constructed.

According to Chakra Bahadur Khatri, ward chairman of Baglung Municipality-14, the Jaya Nepal Ishwar Nirman Sewa Pvt Ltd has already signed the contract for the construction of the bridge by mid-January 2083.TAG_OPEN_div_24

He said that the construction company has completed study on the preparation of the basic structure for the bridge and the preparatory work to be done for the construction of the structure.TAG_OPEN_div_22

The bridge will be constructed at a cost of Rs 52.TAG_OPEN_div_20 6 million allocated by the federal government. Ward Chair Khatri said that the bridges are being constructed at the initiative of the people’s representatives on the basis of local needs at a time when not everyone has been able to benefit from the bridges already constructed in Balewa, Kaiya, Paiyupata of Baglung and Kushma of Parbat.

He believes that the bridge will also help increase the income of the locals as there is a possibility of a large settlement near the bridge and there is good plain land in the lower part of the Kaligandaki Corridor.TAG_OPEN_div_18

“The bridge is very important especially as it lies in the middle of Baglung Municipality Ward No. 12, 13 and 14 and leads to the central part of Kushma Bazaar,” said Kamal GC, a local, adding, “The bridge is going to be constructed at the initiative of State Assembly member Dilliram Subedi and mayors of Baglung and Kushma municipalities TAG_OPEN_div_16 । ’

TAG_OPEN_div_14 Until now, it costs Rs 85 for a one-way trip from Balewa to Kushma and Rs 120 for a two-way journey from Bungee Bridge.

Prabhu
sikhar insurance

प्रतिक्रिया दिनुहोस्

global ime
Gili