Kathmandu. The 1,015-metre-long Karnali (Geruwa) Bridge, which was constructed a decade ago, has benefited the locals of the area.
The locals of Rajapur Municipality and the area have been compelled to use boats and stones to cross the river for years.TAG_OPEN_span_32 This bridge is not only the longest bridge in Nepal but it has also been completed 9 months ahead of its construction target.TAG_OPEN_span_31 The construction of the bridge, which began on October 30, 2010, was supposed to be completed by mid-July 2010. The construction of the bridge was completed in mid-September, 2014, nine months ahead of schedule. TAG_OPEN_span_30Locals are happy that the problems faced by pregnant, disabled and sick people in the absence of bridges a decade ago have ended. The bridge, which is 25 km west of the district headquarters Gulariya, has a width of 9 meters and 10 centimeters of double-lane footpath.TAG_OPEN_span_29 More than 2 lakh people of Rajapur area have been benefited after the construction of the bridge. There are.
प्रतिक्रिया दिनुहोस्