Skip to content

Bridge over Buldi River to be constructed at cost of Rs 50 million

nabil bank

Kathmandu. A bridge is being constructed over Buldi rivulet to connect Deurali Nagar of Byas municipality-3 and Bhadgaun of Byas-1. Only 37 percent of the bridge has been completed so far.

Rabindra Tiwari, an engineer at the Infrastructure Development Office, said that the construction company has started the reconstruction of the bridge by dismantling one of the 25-meter long girders. Currently, the work of the foundation is going on. The bridge is constructed at a cost of Rs 50.10 million.

Prabhu
sikhar insurance

प्रतिक्रिया दिनुहोस्

global ime