Repair of Syaphrube-Rasuwagadhi road begins
Rasuwa. Repair of the Syaphrubes-Rasuwagadhi road section, which was damaged by incessant rainfall on October 1,[...]
Repair of Syaphrube-Rasuwagadhi road begins
Rasuwa. Repair of the Syaphrubes-Rasuwagadhi road section, which was damaged by incessant rainfall on October 1,[...]
Bhojpur farmers attracted to commercial beekeeping
Bhojpur. Lately, farmers here have been attracted towards commercial beekeeping. Beekeeping has become the profession of[...]
Details of damage to agriculture and livestock are being collected across the country
Kathmandu. KATHMANDU: The Ministry of Agriculture and Livestock Development has started collecting details of the losses[...]
Nepal Stock Exchange (NEPSE) increased by 5.31 points in pre-open session
Kathmandu. In the pre-open session, the NEPSE index increased by 5.5 points. It closed 58.55 points[...]
Ramechhap-Kathmandu route to be operated 3 days a week
Monthly. Kathmandu – Flights will be operated on the Ramechhap-Kathmandu route from today. Summit, Sita and[...]
Snowfall in northern Gorkha’s Samdo in September
Gorkha. Northern Gorkha, which used to receive snowfall only after the onset of January this year,[...]
Siddhartha Bank Announces Dividend, Bonus and Cash?
Kathmandu. Siddhartha Bank declares dividend on its shares The meeting of the Board of Directors of[...]
Nepal Rastra Bank to withdraw Rs 20 billion in a single day
Kathmandu. KATHMANDU: Nepal Rastra Bank (NRB) has decided to withdraw Rs 20 billion in a single[...]
Red River damages Rs 15 crore as embankment collapses
Jaleshwar. The recent floods of the Red River have damaged the embankment amounting to Rs 150[...]
Rs 12 billion to be spent on reconstruction of damaged roads
Kathmandu. The government has said that Rs 12.38 billion will be required for the reconstruction of[...]
Nepal’s longest Karnali bridge with a length of 1,015 meters (Photos)
Kathmandu. The 1,015-metre-long Karnali (Geruwa) Bridge, which was constructed a decade ago, has benefited the locals[...]
Gaurighat bridge completed after 1 year of delay
Kathmandu. The bridge from Gaurighat to Guheshwori Temple has been completed after a year. The construction[...]