Muglin. Two-way traffic has resumed on the Narayangadh-Muglin road section.
According to the Road Division Office, Bharatpur, only one-way traffic has been in operation since 9:00 am this morning after a landslide occurred nearby Tuinkhola at Ichhakamana-5 in Chitwan.
According to road supervisor Ishwor Chhetri, the two-way traffic has come into operation since 11.00 am after removing the landslide debris with the help of a machine of the Road Division Office.
The Road Division Office, Bharatpur has urged the people to travel safely only by checking the road carefully as there is a high risk of stone falling in this area during the rainy season.






प्रतिक्रिया दिनुहोस्