Skip to content

Kechana-Kanchenjunga road blocked due to landslide

nabil bank

Ilam. The Kechana-Kanchenjunga road has been completely blocked due to landslides. The road has been obstructed due to landslide at Ghorlebhir of Ilam Municipality-11, Soyak last night.

TAG_OPEN_div_23 The road leading to Jhapa via Golakharka of Ilam has also been blocked due to landslides triggered by landslides. Entrepreneurs have been compelled to ply their vehicles through the long-distance Mechi Highway after the road was blocked.

According to Assistant Chief District Officer Bholanath Guragain, the process of clearing the landslide is going on with the active participation of Nepal Police, Road Division Office, contractors, transport entrepreneurs and locals. TAG_OPEN_div_21

Kaligandaki corridor blocked

Meanwhile, TAG_OPEN_div_17 a dry landslide at Kalakhola on the Baglung-Balewa section of the Kaligandaki Corridor has blocked the road. The Baglung-Kushmishera road connecting Baglung Bazaar with the southern region has also been obstructed due to landslides.

According to police, all vehicles plying west from Baglung via Gulmi, Syangja, Palpa and Rupandehi have not been able to ply due to the blockade of the TAG_OPEN_div_15 corridor. Goods trucks carrying goods from Bhairahawa have also been stopped at Kalakhola.

District Traffic Police Chief Gangaram BK said that it was difficult to open the road due to continuous landslides in the TAG_OPEN_div_13.

Prabhu
sikhar insurance

प्रतिक्रिया दिनुहोस्

global ime
Gili