Skip to content

Dhobi Khola River Corridor Road Repair Works

nabil bank

Kathmandu. The Dhobi Khola River Corridor road in Kathmandu has been repaired.

The Kathmandu Metropolitan City (KMC) and the Kathmandu Metropolitan City (KMC) under the Ministry of Urban Development are carrying out repair works from Bagmati Dobhan of Dhobi Khola corridor to Baijani Bridge in Chabahil.

The Dhobi Khola corridor falls under the jurisdiction of the authority. Currently, the repair of the road on the right side of the corridor has been completed. Work is being done on the left bank.

The NEA had urged the Kathmandu Metropolitan City (KMC) to repair the road along the Dhobikhola corridor and the Kapan-Budhanilkantha flood control project due to potholes.

The Kathmandu Metropolitan City (KMC) is repairing the road at the request of NEA.

Prabhu
sikhar insurance

प्रतिक्रिया दिनुहोस्

global ime
ime
citizen life