Skip to content

Two-way road resumes after clearing landslide at Ghoptebhir

nabil
global ime

Chitwan. The two-way road has been opened after clearing the dry landslide that occurred at Ghoptebhir at Ichhakamana-4 along the Prithvi Highway.

{{TAG_OPEN_div_11} The road, which was blocked due to a landslide this morning, has now come into operation from 2:15 pm. Earlier, the road was opened from 12 noon.

According to Superintendent of Police Rameshwor Poudel, chief of the District Police Office, the vehicles that were stopped have been able to move towards their destinations smoothly after the two-way operation of the road. Earlier, the vehicles were sent to their destinations by queuing up when the road was one-way.TAG_OPEN_div_9

According to Engineer Sachindra Mishra, information officer of the western section of the Naubise-Muglin Road Project, it was difficult to clear the road as the dry landslide was falling from about 35 meters above. Although the wall was not cut at the place, the landslide fell from above itself. He said that there is a risk of landslide at any time as the place is weak.TAG_OPEN_div_7

Prabhu
sikhar insurance

प्रतिक्रिया दिनुहोस्

citizen life
MAK 4T
Gili
CG Digital