Narayanghat-Butwal road to be accessible
Nawalpur. The Narayanghat-Butwal road section of the East-West Highway is becoming easier for travel. According to[...]
Narayanghat-Butwal road to be accessible
Nawalpur. The Narayanghat-Butwal road section of the East-West Highway is becoming easier for travel. According to[...]
Reconstruction of Miteri Bridge over Lhende River linking Nepal and China in final stage
Rasuwa. KATHMANDU: The reconstruction of the Miteri Bridge over Lhendekhola between Nepal and China has reached[...]
The Department has given permission for the construction of 10 hydropower projects.
Kathmandu. The Department of Electricity Development has granted construction permission to a total of 10 hydropower[...]
107 houses in Bhulke of Bhojpur to be electrified
Bhojpur. Bhojpur: Central electricity service has been expanded to 107 houses at Ram Prasad Rai rural[...]
Two hydropower projects to be constructed at Rahughat
Myagdi. The Tundi Power Company has constructed two hydropower projects on the Rahughat River that flows[...]
Transmission line of 6 industries for non-payment of dedicated and trunk line dues disconnected
Kathmandu. During load shedding, the industries that have not paid the premium duty by consuming electricity[...]
1,650 MW electricity demand on Laxmi Puja evening, 1,015 MW electricity exported
. Tihar is considered as the festival of lights, lights and flowers. Lighting lamps and lighting[...]
Electricity supply eased on Laxmi Puja day, Energy Minister Ghising reaches dispatch centre in Syuchatar
Kathmandu. Minister for Energy, Water Resources and Irrigation, Physical Infrastructure and Transport, and Urban Development Kulman[...]
NEA determined to clear arrears of dedicated feeder and trunk line: Executive Director Silwal
Kathmandu. The Nepal Electricity Authority (NEA) has said it is determined to clear the dues of[...]
All 6 floodlight towers installed at Kirtipur Cricket Ground
Kathmandu. All 6 floodlight towers of the under-construction international standard cricket ground have been erected at[...]
Today is the last day to pay the arrears of dedicated and truck lines.
Kathmandu. The deadline given by the Nepal Electricity Authority (NEA) to pay the outstanding electricity tariff[...]
Rs 66,000 repaired bridge over Arjekhola
Myagdi. MYAGDI: Locals of Myagdi district have donated voluntary labour to repair a suspension bridge over[...]