Nuwakot’s Trishuli area connected to road network
Kathmandu. The road across Trishuli River in Nuwakot, which was affected by the flooding in Bhotekoshik[...]
Nuwakot’s Trishuli area connected to road network
Kathmandu. The road across Trishuli River in Nuwakot, which was affected by the flooding in Bhotekoshik[...]
The submerged road at Krishnabhir will not be constructed immediately, an alternative route has been sought
Kathmandu. The search for an alternative route has been started after the conclusion that the road[...]
Bhotekoshi floods: Rescue team mobilized at Rasuwagadhi hydropower project site
Kathmandu. A rescue team has been mobilized to search for the missing people from the Rasuwagadhi[...]
Bhotekoshi floods: Real time update system for search and rescue and reconstruction being developed
Kathmandu. The Ministry of Energy, Water Resources and Irrigation has started developing a real-time update system[...]
Vehicular traffic to be operated on alternative route after road collapses at Krishnabhir
Kathmandu. An alternative road has been used for the vehicles going out of Kathmandu after the[...]
Flood in Trishuli swept away suspension bridge at Charaudi
Kathmandu. The flood in the Trishuli River on Sunday morning swept away the suspension bridge in[...]
Search and rescue operation begins at Trishuli-3 ‘B’ project site
KATHMANDU: A technical team including Nepal Army has been mobilized for search and rescue of the[...]
Water level in Bhotekoshi and Trishuli rivers rises, high alert urged in coastal areas
Kathmandu. Disaster management expert Ujjwal Upadhyay has said that high alertness should be maintained in the[...]
Landslides obstruct Kathmandu-Muglin road section
{{TAG_OPEN_p_5}Kathmandu. The Muglin-Kathmandu road section has been completely obstructed after a road collapsed at Krishnabhir area[...]
537 people out of contact with nine hydropower projects
{{TAG_OPEN_div_16} Kathmandu. As many as 537 employees and workers of nine hydropower projects have been incommunicado[...]
Rescue of stranded passengers at Dhunche begins
Bhaktapur. The rescue of people stranded in Dhunche due to the flood in the Bhotekoshi River[...]
More than two crore electricity dues recovered from power cuts
Tanahun. The Nepal Electricity Authority (NEA) Tanahun Distribution Center has recovered Rs 2,02,83,104 dues in the[...]