Rasuwa flood disrupts 6 transmission lines, 220 KV substation of Trishuli completely damaged
Kathmandu. Rasuwa: Floods disrupt 6 transmission lines in Rasuwa. According to Nepal Electricity Authority (NEA), the[...]
Rasuwa flood disrupts 6 transmission lines, 220 KV substation of Trishuli completely damaged
Kathmandu. Rasuwa: Floods disrupt 6 transmission lines in Rasuwa. According to Nepal Electricity Authority (NEA), the[...]
IPPAN urges government to prioritize rescue and reconstruction of dozens of hydropower projects damaged by Bhotekoshi floods
Kathmandu. The Independent Power Producers' Association, Nepal (IPPAN) has expressed sorrow over the loss of life[...]
Minister Shrestha directs authorities to expedite rescue and relief in Bhotekoshi floods
Kathmandu. Minister for Energy, Water Resources and Irrigation Biraj Bhakta Shrestha has directed Rasuwa and surrounding[...]
60 Langtang Khola Hydropower Project workers out of contact
Kathmandu. As many as 60 employees including engineers working at the under-construction 20 MW Langtang Khola[...]
The floods damaged 359 ongoing and 394 MW hydropower projects.
. The floods in Rasuwa and Nuwakot have damaged the ongoing and under-construction hydropower projects in[...]
No permission required for private helicopters to be deployed in relief, rescue and search
Kathmandu. It has also been decided that no prior permission is required to mobilize private sector[...]
Floods in Rasuwa damage 12 hydropower projects
Kathmandu. The flood in the Bhotkoshi River in Rasuwa district on Wednesday morning has damaged 12[...]
Floods disrupt power supply in Rasuwa
Kathmandu. The floods that occurred in Rasuwa district on Wednesday have damaged the power houses and[...]
The road that should be completed in two years will be the same in 10 years.
Baglung. How many years will it take to blacktop a road? The answer can be simple,[...]
The much-awaited 40 MW Rahughat Hydropower Project has been completed.
Myagdi. The much-awaited Rahughat Hydropower Project in Myagdi district has been completed. The construction of the[...]
Electricity consumers will be provided at subsidized rates: Minister Shrestha
Biratnagar. Minister for Energy, Water Resources and Irrigation, Biraj Bhakta Shrestha, has said that the government[...]
Hetauda Textile Industry: After two and a half decades, Lum’s voice resonates
Hetauda. The building has been deserted for a long time, the equipment covered in dust and[...]