Bhotekoshi floods in a month: 5,550 still missing, damages worth over Rs 408 billion
Kathmandu. It has been a month since the sudden flood in the Bhotekoshi River in Rasuwa.[...]
Bhotekoshi floods in a month: 5,550 still missing, damages worth over Rs 408 billion
Kathmandu. It has been a month since the sudden flood in the Bhotekoshi River in Rasuwa.[...]
Roshi River’s water level crosses danger level: TikTok, reels, appeal not to go near for photos and videos
Kavrepalanchowk. The water level of the Roshi river has crossed the danger level due to incessant[...]
Why did IPPAN disagree with the draft grid connection procedure? 19-point amendment proposal
Kathmandu. The Independent Power Producers' Association, Nepal (IPPAN) has demanded an amendment to the draft of[...]
15 families rescued from Hanumante and Godavari rivers
Bhaktapur. As many as 15 families living in tents on the banks of the rivers that[...]
Vehicular movement halted after bridge linking Bode and Mulpani collapses
Bhaktapur. The vehicular movement has been halted after the bridge over the Manohara River linking Bode[...]
All three units of Kulekhani to generate full electricity to prevent water level rise
Bagmati. The Kulekhani Hydropower Project in Makwanpur has fully generated electricity in all three units to[...]
31 gates opened as water level rises in Saptakoshi River
Sunsari. As many as 31 gates of the Koshi Barrage have been opened after the water[...]
Minister and Chinese envoy hold discussion on Kerung border point, call for effective operation of Korala and Tatopani border points
KATHMANDU: Minister for Infrastructure Development Sunil Lamsal and Chinese Ambassador to Nepal Wang Maoming held a[...]
Traffic on Tribhuvan Highway has increased.
Kathmandu. The number of vehicles on the Tribhuvan Highway has increased significantly. Due to the obstruction[...]
40 MW Rahughat hydropower project connected to national grid
Kathmandu. The 40 MW Rahughat Hydropower Project is connected to the national transmission system. Raghuganga Hydropower[...]
Landslides obstruct Narayangadh-Muglin and Prithvi Highway
Narayangadh. The Narayangadh-Muglin road section has been obstructed due to landslides at various places of Chitwan[...]
Landslide hits Kathmandu, Bharatpur road
Tanahun. Vehicular movement has been affected due to landslides on the road from Tanahun to Kathmandu[...]