Bhotekoshi floods: 48 suspension bridges damaged, 28 new bridges to be constructed: PM Shah
Kathmandu. Prime Minister Balendra Shah has said that 48 suspension bridges have been damaged due to[...]
Bhotekoshi floods: 48 suspension bridges damaged, 28 new bridges to be constructed: PM Shah
Kathmandu. Prime Minister Balendra Shah has said that 48 suspension bridges have been damaged due to[...]
Bhotekoshi floods: Langtang Khola hydropower project to resume work from today
Kathmandu. Work on the affected areas of the Langtang Khola Hydropower Project will begin from today.[...]
Repair of roads underway in flood-hit areas
{{TAG_OPEN_div_16} Kathmandu. The government has started repairing the roads damaged by the floods. According to Dr.[...]
Climate change causes floods in Bhotekoshi, response is global responsibility: PM Shah
Kathmandu. Prime Minister Balendra Shah has said that the flooding in the Bhotekoshi River in Rasuwa[...]
Rasuwa floods swept away 33 bridges, 53 suspension bridges damaged
Kathmandu. As many as 53 suspension bridges have been damaged by the floods in Rasuwa. Of[...]
Rasuwa floods damage more than 7,500 houses, houses worth Rs 12 billion damaged
Kathmandu. A total of 7,570 private houses in five districts have been damaged due to the[...]
Erosion at 3 places on Naubise-Malekhu section of Prithvi Highway
Chitwan. The Naubise-Malekhu road section of the Prithvi Highway has collapsed at three places after the[...]
4 temporary routes including Dhadingbeshi-Sunaula Bazaar-Bhorle, Laskare-Koshikhola-Forsetar-Kalleritar
Dhading. Four alternative roads have been designated as temporary transport routes to ease the operation of[...]
4 temporary routes including Dhadingbeshi-Sunaula Bazaar-Bhorle, Laskare-Koshikhola-Forsetar-Kalleritar
Dhading. Four alternative roads have been designated as temporary transport routes to ease the operation of[...]
New route for vehicles heading to Kathmandu and Hetauda
Kathmandu. The Nepal Police Headquarters has fixed the new route for vehicles plying from Hetauda of[...]
One-way route from Hetauda to Kathmandu
Hetauda Due to the increase in traffic on the Hetauda-Kathmandu road, different routes will have to[...]
Bhotekoshi floods: Power supply restored in most parts of Rasuwa
Kathmandu. Power supply has been disrupted in various areas of Rasuwa district due to floods in[...]