Singati Hydropower to invest Rs 9.5 billion in 61 MW Narkhola project
Kathmandu. The Narkhola Hydropower Project of 61 Mogawatt to be constructed with the main investment of[...]
Singati Hydropower to invest Rs 9.5 billion in 61 MW Narkhola project
Kathmandu. The Narkhola Hydropower Project of 61 Mogawatt to be constructed with the main investment of[...]
60 per cent of Saljhandi-Dhorpatan road works completed
Baglung. Work on the Baglung section of Saljhandi-Dhorpatan road has not gained momentum. Locals and tourists[...]
Structures to be constructed in 13 bigha of land in Tulsipur Industrial Village
Dang. Structures are being constructed in the industrial village under construction at Tulsipur Sub-metropolis-16 in Dang[...]
Agreement reached to upgrade the Sanga-Dhulikhel road that has been stalled in Banepa’s Pul Bazaar
Kathmandu. The Sanga-Dhulikhel road expansion project under the upgradation of the Suryabinayak-Dhulikhel road section of the[...]
5 Uyog pays second installment of dedicated and trunk line
Kathmandu. As many as 5 different industrialists have paid the second tranche of their dues for[...]
Minister Kulman Ghising inspects under-construction Koshi Hospital building
Kathmandu. Minister for Energy, Water Resources and Irrigation, Physical Infrastructure and Transport, and Urban Development Kul[...]
BIN Power Summit: Policy intervention needed to increase investment in energy sector: Senior Vice President Dangi
. Experts have said that policy intervention is needed to increase investment in the energy sector[...]
How much share of Upper Arun to NRN, Nepalis living abroad and general public?
Kathmandu. The government has proposed to issue shares worth Rs 12.95 billion to Non-Resident Nepalis (NRNs)[...]
Minister Ghising inspects disaster-hit Roshi area, prioritizes reconstruction of structures damaged by rivers
Kathmandu. Minister for Energy, Water Resources and Irrigation, Physical Infrastructure and Transport, and Urban Development Kulman[...]
Hydro Power’s profit up by 92 percent: Upper Tamakoshi, how much of others?
Kathmandu. In the first quarter of the current fiscal year, there has been a significant improvement[...]
The Kirakhor-Neptchaur section is being blacktopped at a cost of Rs 100 million.
Myagdi. The Kirakhor-Neptichaur section of Beni-Pakhapani road section is being blacktopped. The two-kilometer road from Kirakhor[...]
Electricity Regulatory Commission gets approval to join Safir
Kathmandu. KATHMANDU: The Electricity Regulatory Commission (ERC) has become a member of the South Asia Forum[...]