Municipality installs ‘high mast lights’ in market area for safety
Palpa. A 'high mast light' has been installed in bezad bazaar area of Rampur municipality for[...]
Municipality installs ‘high mast lights’ in market area for safety
Palpa. A 'high mast light' has been installed in bezad bazaar area of Rampur municipality for[...]
Bhatauli rivulet flood: Bridge damaged, vehicular movement suspended
Manthali. The flood has damaged a concrete bridge over the Bhatauli rivulet, which connects the district[...]
Bailey bridge constructed on Puwa rivulet, 36 km shortened
Ilam. A bailey bridge has been constructed at Puwa khola under the Kechana-Kanchanjunga (Mechi Corridor) road[...]
Construction of Lothar-Amlekhgunj second phase petroleum pipeline begins
Chitwan. The pipeline from Amlekhgunj in Bara to Lothar in Chitwan is in progress. Nepal Oil[...]
Sindhuli section of mid-hill highway blocked due to landslide
Sindhuli. Sindhuli section of the Mid-Hill Highway has been obstructed since this morning. The highway has[...]
95% of Bhojpur Khoksik residents have access to central electricity
Bhojpur. 95 percent of the people of Khoxik of Ram Prasad Rai Rural Municipality-8 located in[...]
Kumari Bank to invest Rs 41.6 billion in Upper Seti Hydropower Project
Kathmandu. The financial management of the 216 MW Upper Seti Hydropower Project to be constructed in[...]
We will bring prosperity by selling electricity, we cannot sell people’s blood: Energy Minister Khadka
Kathmandu. Minister for Energy, Water Resources and Irrigation Deepak Khadka said, "People's sweat is sold, but[...]
Job creation and self-reliance possible through skill-based training: Energy Minister Khadka
Sankhuwasabha. Minister for Energy, Water Resources and Irrigation Deepak Khadka has said that employment generation and[...]
IPPAN reaches out to Finance Ministry to Finance Committee demanding scrapping of double-age system
Kathmandu. The Independent Power Producers' Association of Nepal (IPPAN) has drawn the attention of four agencies[...]
Construction of concrete bridge at Sisuwa khola of Silichong rural municipality completed
Sankhuwasabha. Sankhuwasabha: A 45-metre-long concrete bridge constructed at Sisuwakhola of Silichong rural municipality in Sankhuwasabha has[...]
Rs 2.8 billion grant to build BP highway
Kathmandu. The government has decided to accept grant assistance worth 2.8 billion Japanese yen from the[...]