Most of the multi-year projects of Bagmati have been completed.
Kathmandu. Most of the multi-year projects run by the Urban Development and Building Office, Makawanpur in[...]
Most of the multi-year projects of Bagmati have been completed.
Kathmandu. Most of the multi-year projects run by the Urban Development and Building Office, Makawanpur in[...]
Myagdi expands drinking water facility to 338 households at a cost of Rs 17.1 million
Myagdi. A total of 338 families have benefited from three drinking water projects constructed in Malika[...]
Need to prepare skilled human resources to make Sankhuwasabha a hydropower hub: Energy Minister Khadka
Sankhuwasabha. Minister for Energy, Water Resources and Irrigation Deepak Khadka has stressed the need of equipping[...]
Minister Khadka inaugurates motorable bridge, road and hydropower projects to move forward
Sankhuwasabha. Minister for Energy, Water Resources and Irrigation Deepak Khadka inaugurated the motorable bridge constructed at[...]
Link research results to productivity enhancement: Minister Dahal
Kathmandu. Minister for Physical Infrastructure and Transport Devendra Dahal has stressed the need to link the[...]
Tanahu Hydropower Project installs sensors to provide information about water level
Damauli. Tanahun: Sensors have been installed at the construction site of the 140 MW Tanahun Hydropower[...]
Bhagawati-Begkhola road upgrade begins
Myagdi. The upgradation of Bhagawati-Begkhola road of Raghuganga rural municipality has begun from today. The construction[...]
Reconstruction of Jonglung monastery incomplete due to lack of funds
Taplejung. The construction and management of The Jonglung Monastery located at Tokpegola of Mikwakhola Rural Municipality-5[...]
Thankot-Chitlang road will contribute to economic development and prosperity: Minister Dahal
Kathmandu. Minister for Physical Infrastructure and Transport Devendra Dahal has directed to speed up the leveling[...]
Infrastructure Development Office upgrades 30 rural roads in Myagdi
Myagdi. The District Infrastructure Development Office has upgraded 30 rural roads in the fiscal year 2081/82[...]
Khuttikhola irrigation canal, which has been stalled for four years, will be brought into operation
Siraha. Khutti Irrigation Canal at Lahan, which has been stalled for four years after the construction,[...]
‘Emergency action plan’ prepared for drought-hit Madhes, minister Khadka directs to provide immediate relief
Kathmandu. A high-level task force formed by the Ministry of Energy, Water Resources and Irrigation has[...]