NEA Executive Director Shakya arrives in Janakpur to enquire about ‘deep boring installation’
Kathmandu. Nepal Electricity Authority (NEA) Executive Director Hitendra Dev Shakya has reached Janakpur to enquire about[...]
NEA Executive Director Shakya arrives in Janakpur to enquire about ‘deep boring installation’
Kathmandu. Nepal Electricity Authority (NEA) Executive Director Hitendra Dev Shakya has reached Janakpur to enquire about[...]
NEA Executive Director Shakya arrives in Chitwan after talk of load shedding
Kathmandu. Nepal Electricity Authority (NEA) Executive Director Hitendra Dev Shakya has reached Chitwan. He reached Chitwan[...]
Passengers face trouble to reach Kusheshwar Mahadev (Photo Feature)
Kathmandu. It is difficult to visit kusheshwar Mahadev temple, a famous religious place of Hindus located[...]
US won’t stop MCC work in Nepal: Finance Ministry
Kathmandu. The programs run in Nepal with the grant of The Millennium Challenge Corporation (MCC), a[...]
PM takes initiative to solve problems in entry point area of fast track
Kathmandu. Kathmandu: Prime Minister KP Sharma Oli has taken initiatives to solve the problems seen in[...]
Construction of suspension bridge over Ninda river at a cost of Rs 43.8 million
Jhapa. A suspension bridge has been constructed at a cost of Rs 43.8 million across the[...]
It is difficult to drive on the main road of Ramechhap
Ramechhap. The main roads here are in shambles as the contractors have not completed the work[...]
India, China have made progress in electricity, Nepal has to follow the same wave: Minister Khadka
Kathmandu. Minister for Energy, Water Resources and Irrigation Deepak Khadka has said that Nepal should follow[...]
Construction of sunkoshi river bridge stuck for five years
Kavrepalanchowk. Kavrepalanchowk and Sindhupalchowk-based bridge over sunkoshi river has been stuck for the past five years.[...]
Energy Minister Khadka’s khandan in the notice of the Electricity Authority: Rumors spread about load shedding
Kathmandu. Chitwan: Minister for Energy, Water Resources and Irrigation Deepak Khadka has said rumours of load-shedding[...]
Humla-Mugu Link Road: Bailey Bridge to be installed at a cost of Rs 50 million
Humla. The bailey bridge has been constructed at Lotikhola of Changkheli rural municipality connecting Humla and[...]
Load-shedding begins from West Chitwan, 6-hour line to be cut in two phases from today
Chitwan. The Nepal Electricity Authority (NEA) Chanauli Distribution Centre has released the schedule of load shedding[...]