Construction of trekking route connecting religious jaljala on the border of Myagdi, Parbat and Kaski
Myagdi. Myagdi: A trekking route connecting Jaljala, a religious and tourist destination on the border of[...]
Construction of trekking route connecting religious jaljala on the border of Myagdi, Parbat and Kaski
Myagdi. Myagdi: A trekking route connecting Jaljala, a religious and tourist destination on the border of[...]
Second section of ring road expansion: Road covered with grass and weeds, but no work (Photo Feature)
Kathmandu. The second section of the ring road expansion from Kalanki to Sukedhara Dhobi khola road[...]
Two new bridges open in Sankhuwasabha
Khandbari. Sankhuwasabha: A concrete bridge connecting two important places of Sankhuwasabha has officially come into operation[...]
Road blacktopped after 33 years of opening of track
Gorkha. Gorkha: The blacktopping work on the Majhuwa-Baitari-Hatia road section of Gorkha municipality has begun after[...]
Butwal-Narayangadh-Daunne road closed 63 times in one year
Nawalparasi. The Daunne section of the Butwal-Narayangadh road has been obstructed 63 times in a year.[...]
11 bridges constructed on western section of Pokhar-Muglin road, two under construction
Gandaki. Eleven bridges have already been constructed and two bridges are under construction in pokhara-Jamuna, the[...]
Muglin-Pokhara road: Tanahun section blacktopped
Kathmandu. The work on the Tanahun section of muglin-Pokhara road has almost been completed. According to[...]
Beni Municipality completes 329 projects in fiscal year 2081/82
Myagdi. Beni Municipality has completed 329 projects in the fiscal year 2081/82 BS. Out of the[...]
Arun III project will benefit sankhuwasabha residents: Energy Minister
Kathmandu. Similarly, Minister for Energy, Water Resources and Irrigation Deepak Khadka said the Arun III hydropower[...]
Physical Infrastructure Minister Dahal’s one year: Blacktopping more roads than target, installing 10 bailey bridges (Full text)
Kathmandu. Minister for Physical Infrastructure and Transport Devendra Dahal has made public the details of the[...]
Construction of concrete bridge at Kulungkhola of Tanahun at a cost of Rs 70 million
Tanahun. A 72.20-meter long concrete bridge has been constructed at Kulungkhola flowing through Bhimad Municipality-1. According[...]
Embankment to prevent erosion of Kaligandaki
Myagdi. An embankment has been constructed at Lamgara of Beni municipality-1, which is prone to erosion[...]