Electricity from central transmission line at Churibot of Malika rural municipality
Myagdi. Myagdi: Churibot of Malika rural municipality-4 in Myagdi district has been electrified. Nepal Electricity Authority[...]
Electricity from central transmission line at Churibot of Malika rural municipality
Myagdi. Myagdi: Churibot of Malika rural municipality-4 in Myagdi district has been electrified. Nepal Electricity Authority[...]
Sun Nepal Life Insurance opens 224,000 units of shares today
Kathmandu. Sun Nepal Life Insurance limited has auctioned 224,000 units of shares. The company has put[...]
Road connecting ghodepani to be upgraded
Myagdi. Myagdi: The road connecting Ghodepani, a tourist spot in Annapurna Rural Municipality-6 of Myagdi, has[...]
Banepa-Nala-Bhaktapur road blocked again after humpipe soil washed away
Kavrepalanchowk. The Banepa-Nala-Bhaktapur road section, which was opened with a humpipe, has been obstructed again after[...]
Karnali Corridor to be promoted as trade route with China, India: PM Oli
Humla. Kathmandu: Prime Minister KP Sharma Oli has said that the Karnali Corridor would be taken[...]
Take and Pay provision in budget has been revised: Energy Minister Khadka
Kathmandu. Minister for Energy, Water Resources and Irrigation Deepak Khadka has sought a work schedule from[...]
Work on Dodhara-Chandani dry port to begin soon: Home Minister Lekhak
Kanchanpur. Home Minister Ramesh Lekhak has said that the construction of dry port at Dodhara-Chandani in[...]
Work on seating at the under-construction cricket ground in Kirtipur begins (Photofeature)
Kathmandu. Work has been started to set up seats at the under-construction cricket ground in Kirtipur.[...]
45% of under-construction Elephant Crossing completed
Birtamod. Jhapa: The elephant crossing under construction on birtamod-Charali section of Jhapa along the Asian Highway[...]
Kafuche-Kori trekking route to be upgraded
Gandaki. Kaski: The kafuche-Kori trekking route from Naula to Kori via Nauta has been upgraded under[...]
Blocked Nala-Bhaktapur road section opened
Kavrepalanchowk. Traffic has been brought into operation on the blocked Nala-Bhaktapur road section since this morning.[...]
Bridge at Rumtakhola at Rs 60.9 million: Vehicles not stopped in rainy season
Baglung. The contractor has completed the agreement a year ago to complete the construction in April.[...]