Sunkoshi Marine Diversion Project 37% in 7 years
Dhanushadham. The construction work of Sunkoshi Marine Diversion Multipurpose Project, which is seen as a sustainable[...]
Sunkoshi Marine Diversion Project 37% in 7 years
Dhanushadham. The construction work of Sunkoshi Marine Diversion Multipurpose Project, which is seen as a sustainable[...]
Narayanghat-Butwal road project extended by one year
Nawalparasi. The government has extended the deadline of narayanghat-Butwal road project along the East-West Highway by[...]
Drinking water available again in two settlements of Balthali
Kavrepalanchowk. The flood and landslide-damaged drinking water project at Balthali of Panauti municipality-11 has been reconstructed.[...]
Electricity facility extended to 900 households in Myagdi
Myagdi. Myagdi: Electricity from the central transmission line has been extended to about 900 households in[...]
Transport system in Kathmandu Valley will deteriorate further if we do not take decisive action now: Minister Dahal
Kathmandu. Kathmandu: Minister for Physical Infrastructure and Transport Devendra Dahal has said the time has come[...]
Municipality installs ‘high mast lights’ in market area for safety
Palpa. A 'high mast light' has been installed in bezad bazaar area of Rampur municipality for[...]
Bhatauli rivulet flood: Bridge damaged, vehicular movement suspended
Manthali. The flood has damaged a concrete bridge over the Bhatauli rivulet, which connects the district[...]
Bailey bridge constructed on Puwa rivulet, 36 km shortened
Ilam. A bailey bridge has been constructed at Puwa khola under the Kechana-Kanchanjunga (Mechi Corridor) road[...]
Construction of Lothar-Amlekhgunj second phase petroleum pipeline begins
Chitwan. The pipeline from Amlekhgunj in Bara to Lothar in Chitwan is in progress. Nepal Oil[...]
Sindhuli section of mid-hill highway blocked due to landslide
Sindhuli. Sindhuli section of the Mid-Hill Highway has been obstructed since this morning. The highway has[...]
95% of Bhojpur Khoksik residents have access to central electricity
Bhojpur. 95 percent of the people of Khoxik of Ram Prasad Rai Rural Municipality-8 located in[...]
Kumari Bank to invest Rs 41.6 billion in Upper Seti Hydropower Project
Kathmandu. The financial management of the 216 MW Upper Seti Hydropower Project to be constructed in[...]