AGM of Mountain Energy Nepal (AGM) Approved 21.05% Dividend
Kathmandu. KATHMANDU: The twelfth annual general meeting of Mountain Energy Nepal Limited (ME) was held in[...]
AGM of Mountain Energy Nepal (AGM) Approved 21.05% Dividend
Kathmandu. KATHMANDU: The twelfth annual general meeting of Mountain Energy Nepal Limited (ME) was held in[...]
Railing to be installed in Dhobi rivulet after accident
Kathmandu. KATHMANDU: Repair and installation of railings has begun following frequent accidents along the Dhobi Khola[...]
Cold hits power generation in Rasuwa
Rasuwa. Rasuwa: Power generation has been affected in Rasuwa district as the water level in the[...]
Minister Ghising directs to expedite construction of Muglin-Pokhara road
Damauli. Minister for Physical Infrastructure and Transport Kulman Ghising has directed the authorities concerned to complete[...]
Pokhara Academy of Health Sciences to be constructed at a cost of Rs 10.55 crore
Kathmandu. The medical building of the Pokhara Academy of Health Sciences (Pokhara) has not been completed[...]
Around Rs 8.25 billion spent on Beni-Jomsom-Korala road linking India and China
Mustang. A total of Rs 8.20 billion has been spent on the construction of the Kaligandaki[...]
Upper Rawa Khola project shut down again
Khotang. Locals of Kepilasgadhi Rural Municipality have shut down the Upper Rawa Khola Micro Hydropower Project[...]
Most of the bridges in Madhes have been in limbo for years: Minister Ghising vows to take precaution in the construction of bridges
Rautahat. Locals of Rautahat and Sarlahi districts of Madhes province have been facing problems due to[...]
Contractors commit to bring East-West Highway into operation by December
Kathmandu. Contractors have pledged to complete the construction of Dudhaura bridge along the Pathlaiya-Dhalkebar section of[...]
UML General Convention: Nagdhunga-Malekhu road section to be closed today and tomorrow
Dhading. The Nagdhunga-Malekhu road section, which is being partially closed for five hours daily, has been[...]
33 bridges constructed on eastern section of Narayangadh-Butwal road
Nawalparasi. The construction of 33 bridges in the eastern section of the Narayangadh-Butwal road expansion project[...]
We are preparing to open PPA on ‘Take or Pay’ model: Kulman Ghising
The government infrastructure and property were extensively damaged during the Genji agitation against corruption and other[...]