1,650 MW electricity demand on Laxmi Puja evening, 1,015 MW electricity exported
. Tihar is considered as the festival of lights, lights and flowers. Lighting lamps and lighting[...]
1,650 MW electricity demand on Laxmi Puja evening, 1,015 MW electricity exported
. Tihar is considered as the festival of lights, lights and flowers. Lighting lamps and lighting[...]
Electricity supply eased on Laxmi Puja day, Energy Minister Ghising reaches dispatch centre in Syuchatar
Kathmandu. Minister for Energy, Water Resources and Irrigation, Physical Infrastructure and Transport, and Urban Development Kulman[...]
NEA determined to clear arrears of dedicated feeder and trunk line: Executive Director Silwal
Kathmandu. The Nepal Electricity Authority (NEA) has said it is determined to clear the dues of[...]
All 6 floodlight towers installed at Kirtipur Cricket Ground
Kathmandu. All 6 floodlight towers of the under-construction international standard cricket ground have been erected at[...]
Today is the last day to pay the arrears of dedicated and truck lines.
Kathmandu. The deadline given by the Nepal Electricity Authority (NEA) to pay the outstanding electricity tariff[...]
Rs 66,000 repaired bridge over Arjekhola
Myagdi. MYAGDI: Locals of Myagdi district have donated voluntary labour to repair a suspension bridge over[...]
Khongtang-Khawa Bhanjyang road upgraded
Bhojpur. A rural road linking Khawa Bhanjyang via Khongtang-Hunge-Cholanti of Temkemaiyung rural municipality has been upgraded.[...]
Kanchanpur-Kamala road: 67 per cent progress despite two extensions
Head. The deadline for the expansion and up-gradation of the Kanchanpur-Kamala road, which has been forwarded[...]
Construction of overpass halted in Lahan begins
Head. The construction of the Kanchanpur-Kamala road section along the East-West Highway that was stalled for[...]
15-meter-long wooden bridge constructed after floods swept away slopes
Khotang. Locals have constructed a wooden bridge through voluntary labour to resume the transport service which[...]
Mechi highway resumes after two weeks
Ilam. The Mechi Highway, which was blocked due to landslide triggered by rain-triggered rain on October[...]
Process begins to terminate contract of 25 more patients who have been in limbo for years
Kathmandu. KATHMANDU: The process of terminating the contracts for the construction of roads and bridges has[...]