Mustang. The under-construction motorable bridge over Thini River that flows through Gharpajhong rural municipality-5 has reached the final stage.
The project was implemented by the Infrastructure Development Office under the Ministry of Physical Infrastructure and Transport of Gandaki Province to connect the Gharpajhong Ring Road.
The bridge will be 8.4 meters wide and 35 meters long, said Ganashyam Rokkamagar, an engineer at the Infrastructure Development Office. The bridge cost is Rs 4.46 crore. The bridge is expected to be completed by August 12.






प्रतिक्रिया दिनुहोस्