Skip to content

Acro Bailey Bridge over Falakhu River linking Nuwakot and Rasuwa

Kathmandu. The Acro Bailey Bridge over the Falakhu River at Betrawati on the border of Nuwakot and Rasuwa has been put into operation.

The installation of the 240-foot-long Acro Bailey Bridge constructed by the Nepal Army has been completed. The bridge, which has a capacity to carry 40 tons, has come into operation from today.

With the installation of the Ecro Bridge, people of Nuwakot and Rasuwa area will be able to travel smoothly and transportation of relief and essential goods to flood-affected areas.

Prabhu
sikhar insurance

प्रतिक्रिया दिनुहोस्

bulet bike
citizen life
MAK 4T
sanima