Skip to content

Rain-induced Jomsom-Korala road obstructed

nabil
global ime

Mustang. The Jomsom-Korala road, which was blocked due to heavy rains, has been repaired.

Heavy rainfall triggered by the Arnab cyclone had disrupted the road section in Baragung Mukti Chhetra-3 since this morning.

Tejaswi Sharma, chief of the Beni-Jomsom-Korala Road Project, said that the road was upgraded by the gabin wall before this.

Project Chief Sharma said that the road has been constructed by filling the soil with a ‘gabin wall’ to resume vehicular movement along the Korala road immediately.

Prabhu
sikhar insurance

प्रतिक्रिया दिनुहोस्

citizen life
MAK 4T