Kathmandu. Tulsipur Sub-Metropolitan City has blacktopped 15-km road in the last fiscal year.
According to the Sub-metropolis office, the road from Charbato Chowk to Eclever in ward-4, 559 metres from Bassota to Matera and two kilometres from Rapti Highway to Pilibot have been blacktopped.
Likewise, a 9,958-metre cemented drain, three ward office buildings, a health post building, an eight-room building of a secondary school and a two-room primary school building have been constructed.
In the last fiscal year, a well-managed haat bazaar site was constructed and a Ratamata irrigation canal was constructed.









प्रतिक्रिया दिनुहोस्