{{TAG_OPEN_div_40} The flood current of the Bhotekoshi River entered the Tadi River and damaged two concrete bridges at the same place.
Crowbridge over Tadikhola project to come into operation within five days
According to Lieutenant Colonel Chirinjibi Chaulagain, who is leading the construction of the bridge, the bridge is being constructed through the bridging unit under the Nepal Army’s Shree 14 Battalion Command.TAG_OPEN_div_38






प्रतिक्रिया दिनुहोस्