बजेट अभाव हुँदा म्याग्दीका बहुवर्षीय सडक आयोजना प्रभावित
काठमाडौं । बजेट अभावका कारण गण्डकी प्रदेश सरकारमार्फत जिल्लामा सञ्चालित रणनीतिक महत्वका बहुवर्षीय सडक आयोजनाहरुको निर्माण[...]
बजेट अभाव हुँदा म्याग्दीका बहुवर्षीय सडक आयोजना प्रभावित
काठमाडौं । बजेट अभावका कारण गण्डकी प्रदेश सरकारमार्फत जिल्लामा सञ्चालित रणनीतिक महत्वका बहुवर्षीय सडक आयोजनाहरुको निर्माण[...]
NOC submits proposal to India for construction of gas pipeline and storage infrastructure
Kathmandu. After the United States and Israel launched a joint air strike on Iran, there was[...]
Parliament returning to Singha Durbar after Constituent Assembly
Kathmandu. The parliament session which has been held outside Singha Durbar since May 2008 following the[...]
Recommendation for reconstruction of houses after one and a half years of floods and landslides
Kabhrepalanchok. The District Disaster Management Committee has started recommending the names of the victims for the[...]
Dandakhet-Rahughat transmission line: More than Rs 30 million compensation distributed
Myagdi. The Nepal Electricity Authority (NEA) has distributed more than Rs 30 million compensation to the[...]
Municipality impounds vehicle of contractor for stalling hospital building
Kathmandu. Halesi Tuwachung Municipality has taken stern action against the contractor for delaying the construction of[...]
Brick factories affected by unseasonal rain
Mahottari Brick factories in Mahottari have suffered a loss of more than Rs 60 million due[...]
Suryabinayak-Dhulikhel road works 67 per cent in last three years
Kabhrepalanchok. The six-lane road section from Suryabinayak of Bhaktapur to Dhulikhel of Kavrepalanchowk is being expanded[...]
The Dhulikhel-Khawa road has been upgraded for Rs 31.5 crore
Kavrepalanchok. The Dhulikhel-Khawa road section of the Araniko Highway has been upgraded by stopping the vehicular[...]
Electricity reaches remote area of Dang
Dang. Saigha of Ghorahi sub-metropolis-19 has access to electricity service. Locals are happy with the expansion[...]
Butwal-Narayangadh road section obstructed since Friday remains obstructed
Nawalparasi. The Narayangadh-Butwal road section, which has been obstructed since Friday, has not come into operation.[...]
BP Highway completely obstructed due to rain
. The BP Highway linking eastern Tarai and hilly districts has been completely disrupted due to[...]