Kathmandu. The 10-MW Sipring Khola Hydropower Project has been closed due to floods and landslides triggered by incessant rains.
The project operated by the investment of Synergy Power Development Company has been shut down due to floods and landslides that occurred at 11:00 pm on July 21.
The landslide has damaged most of the structures of the project’s headworks.









प्रतिक्रिया दिनुहोस्