5 Uyog pays second installment of dedicated and trunk line
Kathmandu. As many as 5 different industrialists have paid the second tranche of their dues for[...]
5 Uyog pays second installment of dedicated and trunk line
Kathmandu. As many as 5 different industrialists have paid the second tranche of their dues for[...]
Minister Kulman Ghising inspects under-construction Koshi Hospital building
Kathmandu. Minister for Energy, Water Resources and Irrigation, Physical Infrastructure and Transport, and Urban Development Kul[...]
BIN Power Summit: Policy intervention needed to increase investment in energy sector: Senior Vice President Dangi
. Experts have said that policy intervention is needed to increase investment in the energy sector[...]
How much share of Upper Arun to NRN, Nepalis living abroad and general public?
Kathmandu. The government has proposed to issue shares worth Rs 12.95 billion to Non-Resident Nepalis (NRNs)[...]
Minister Ghising inspects disaster-hit Roshi area, prioritizes reconstruction of structures damaged by rivers
Kathmandu. Minister for Energy, Water Resources and Irrigation, Physical Infrastructure and Transport, and Urban Development Kulman[...]
Hydro Power’s profit up by 92 percent: Upper Tamakoshi, how much of others?
Kathmandu. In the first quarter of the current fiscal year, there has been a significant improvement[...]
The Kirakhor-Neptchaur section is being blacktopped at a cost of Rs 100 million.
Myagdi. The Kirakhor-Neptichaur section of Beni-Pakhapani road section is being blacktopped. The two-kilometer road from Kirakhor[...]
Electricity Regulatory Commission gets approval to join Safir
Kathmandu. KATHMANDU: The Electricity Regulatory Commission (ERC) has become a member of the South Asia Forum[...]
Kathmandu’s roads to be made pothole-free
Kathmandu. Road ambulances have been brought into operation to repair potholes and potholes on the roads[...]
Nepal-Bangladesh secretary-level meeting signs six-point agreement: Bangladesh to purchase additional power and initiate investment process in Sunkoshi-3
Kathmandu. The Nepal-Bangladesh secretary-level meeting has concluded. In the meeting, Nepal and Bangladesh have agreed on[...]
Coordinator Dangol directs to include environmental aspect while preparing infrastructure development plan
. Kathmandu Metropolitan City deputy mayor and monitoring committee coordinator Sunita Dangal directed the department to[...]
The 35-meter long bridge costs around Rs 45 million
Mustang. The under-construction motorable bridge over Thini River that flows through Gharpajhong rural municipality-5 has reached[...]