Bridge over Taragadh River in Dailekh built at cost of Rs 30 million
Surkhet. A bridge over Taragadh River that flows through Mahabu Rural Municipality in Dailekh district has[...]
Bridge over Taragadh River in Dailekh built at cost of Rs 30 million
Surkhet. A bridge over Taragadh River that flows through Mahabu Rural Municipality in Dailekh district has[...]
New code comes into effect for earthquake-resilient building construction
Kathmandu. The government has amended and implemented the National Building Code for the construction of earthquake-resistant[...]
Rs 1.25 crore to renovate the roof of Kumari House
Kathmandu. Kathmandu Metropolitan City (KMC) has estimated the cost of renovating the roof of Kumari Bahal[...]
NEA’s new ‘chaos’ in assembly industry, industrialists terrified by Kulman’s policy
Kathmandu. The Nepal Electricity Authority (NEA), which has raised the arrears of dedicated and trunk lines,[...]
Monitoring to upgrade Gaddachauki-Attariya section of highway
Mahendranagar. An on-site monitoring has begun from Gaddachauki of Kanchanpur to upgrade the East-West Highway into[...]
35 industries paid Rs 23.87 crore dedicated and trunk line arrears, how much?
Kathmandu. KATHMANDU: As many as 25 new industries that used to consume electricity from dedicated and[...]
Metropolis operates bulldozer in structure built by former minister Khadka on Scout land
Kathmandu. The dozer has been operated by the Kathmandu Metropolitan City (KMC) in the structure mentioned[...]
156 projects selected for operation in Annapurna
Myagdi. Annapurna Rural Municipality of Myagdi district has selected 156 projects to be implemented in the[...]
Gulmi’s Aapchaur-Shantipur road to be upgraded
Gulmi. The Aapchaur-Shantipur road is being upgraded rapidly. Vehicular movement from Indregauda to Shantipur of Aapchaur[...]
All industries have paid 17.46 crore arrears of dedicated and trunk line, how much is left to be repaid?
Kathmandu. All the industries that are yet to pay additional fees according to the counting seats[...]
Power supply disrupted in Simkot for 4 days
Humla. The district headquarters, Simkot, has been in darkness for the past four days. The power[...]
Kaligandaki Corridor: Lasti-Beni section to be blacktopped
Myagdi. The Lasti-Beni section of the Kaligandaki Corridor is being blacktopped. This is the main road[...]