Jenji Agitation: Federal Parliament building turns into dumping site for burnt vehicles
Kathmandu. A month ago, on September 7 and 24, during the Zenji movement, the Birendra International[...]
Jenji Agitation: Federal Parliament building turns into dumping site for burnt vehicles
Kathmandu. A month ago, on September 7 and 24, during the Zenji movement, the Birendra International[...]
Energy Minister Ghising has 7 demands for flood-affected hydropower projects.
Kathmandu. The Independent Power Producers' Association of Nepal (IPPAN) has demanded various relief packages for flood-hit[...]
Myagdi and Kaski connected to road network
Myagdi. Locals have collected donations to connect Myagdi and Kaski to the road network. According to[...]
Tanahun local levels blacktop 15-km road
Damauli. The local levels in the district have blacktopped 15 kilometers of road in the last[...]
Minister Ghising urges construction of roads linking three provinces with federal capital to come into operation at the earliest
Kathmandu. Minister for Physical Infrastructure and Transport Kulman Ghising has urged the Department of Roads and[...]
Home Minister directs to immediately resume Bhotekoshi hydropower project which was shut down after Genji demanded free shares.
Kathmandu. Minister for Home Affairs Om Prakash Aryal has directed the government to immediately bring into[...]
Energy Minister Ghising and UNDP representatives meet to help Nepalis living abroad in technology to cast their votes
Kathmandu. Minister for Energy, Water Resources and Irrigation, Physical Infrastructure and Transport and Urban Development Kul[...]
Provincial government to reconstruct flood-affected houses
Biratnagar. The Koshi Province government has decided to reconstruct all the houses damaged by floods and[...]
Repair of Syaphrube-Rasuwagadhi road begins
Rasuwa. Repair of the Syaphrubes-Rasuwagadhi road section, which was damaged by incessant rainfall on October 1,[...]
Red River damages Rs 15 crore as embankment collapses
Jaleshwar. The recent floods of the Red River have damaged the embankment amounting to Rs 150[...]
Rs 12 billion to be spent on reconstruction of damaged roads
Kathmandu. The government has said that Rs 12.38 billion will be required for the reconstruction of[...]
Gaurighat bridge completed after 1 year of delay
Kathmandu. The bridge from Gaurighat to Guheshwori Temple has been completed after a year. The construction[...]